      SIMULATION OF THE MILL GRINDING EFFICIENCY                
      (cement mills with 2 chambers) 
                       
                                   
      This simulation has only a didactic purpose!                    
                                   
      Date                        
      Company                  
      Cement plant                
      Mill N°                          
      Instructions for use:                          
      All the blue cells must be filled except the sieves (minimum 5)                  
      Circulation factor is the ratio alimentation/fines.                    
      Cells for 10 sieves are available.                     
      You must fill at least 5 sieves in ascending order.                    
      For the fresh feed, if the passing cumulated on a sieve is higher than 64%, the residue on this sieve can increase             
      inside the mill if the reduction efficiency is bad.                    
      Output     t/h                    
      Circulation factor    (A/F)                    
      % of mill output to the filter                       
      Feed of separator   t/h                    
      Fines of separator   t/h                    
      Rejects of separator   t/h                    
      Mill inlet     t/h                    
                                   
      Useful length of chamber 1 m                    
                                   
      Useful length of chamber 2 m                    
            Passing cumulated in % Passing cumulated in % after simulation (*)     Passing cumulated in % t/h cumulated            
          Sieve µ Separator feed   Sieve µ Separator fines            
                     
                     
                     
                     
                     
                     
                     
                     
                     
                     
          (*) Values change after use of the slider                
                                   
        Passing cumulated   t/h cumulated   t/h cumulated Passing cumulated   Residue cumulated        
      Sieve µ Fresh feed Tails   Fresh feed Tails   Mill inlet   Mill inlet        
      %   % %  
      %   % %  
      %   % %  
      %   % %
      %   % %
      %   % %  
      %   % %  
      %   % %  
      %   % %  
      %   % %  
                                   
        Chamber 1 Chamber 2        
      Sieve µ 0 m      
             
             
             
             
             
             
             
             
             
             
                                   
     
    Unable to load Flash content. The Charts Control requires Flash Player 9.0.45 or higher. You can download the latest version of Flash Player from the Adobe Flash Player Download Center
                               
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                   
                                        Sample number                
                    Use this slider to get the efficiency        
                       
             
      mm Reduction            Speed of reduction graph                
     
    Unable to load Flash content. The Charts Control requires Flash Player 9.0.45 or higher. You can download the latest version of Flash Player from the Adobe Flash Player Download Center
                           
                               
                               
                               
                               
                               
                               
                               
                               
                               
                                    
                                   
                                   
                                   
                                   
                Sieves                  
      Speed of reduction:                          
      First, it is necessary to determine the residues cumulated for each sieve in function of the distance (mill length)            
      Then, an exponential regression equation is defined like this:
     
                 
      where R2 is the residue cumulated at a certain sieve of the sample 2,                  
      R1 is the residue cumulated at a certain sieve of the sample 1,                  
      m is the speed of reduction,                        
      and d is the distance of sample 2 with the mill inlet.                    