      VOLUME LOAD - 2 Compartments Mill  
      This calculator gives the volume load (or filling degree in %) after measurements  
      inside the mill      
      H/D measurement method:      
      Date    
      Company/Plant
      Mill N°  
      Shell diameter m  
      Internal diameter m  
      Chamber 1:      
      Measured height H1 (*) m  
      Measured height H2 (*) m  
      Measured height H3 (*) m  
      Average height H m  
      H/D     
      Volume load chamber 1 %  
     
      Useful length chamber 1 m  
      Tonnage t  
      Chamber 2:      
      Measured height H1 (*) m  
      Measured height H2 (*) m  
      Measured height H3 (*) m  
      Average height H m  
      H/D     
      Volume load chamber 2 %  
     
      Useful length chamber 2 m  
      Tonnage t  
      (*) See where are H1, H2 and H3 on the sketch below  
     
     
     
       
       
       
       
       
       
       
       
       
       
       
    www.thecementgrindingoffice.com
     
     
     
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
     
     
     
       
       
       
       
       
       
       
       
       
       
       
       
       
     
     
     
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
    www.thecementgrindingoffice.com
      Visible plates method:      
      Shell diameter m  
      Internal diameter m  
      Total number of plates    
      Chamber 1:       
      Visible number of plates at inlet  
      Visible number of plates at middle  
      Visible number of plates at outlet  
      Visible number of plates average average  
      Angle θ degrees  
      Angle θ radians  
      Height H m  
      H/D    
      Volume load chamber 1 %  
     
      Useful length chamber 1 m  
      Tonnage t  
      Chamber 2:      
      Visible number of plates at inlet  
      Visible number of plates at middle  
      Visible number of plates at outlet  
      Visible number of plates average average  
      Angle θ degrees  
      Angle θ radians  
      Height H m  
      H/D    
      Volume load chamber 2 %  
     
      Useful length chamber 2 m  
      Tonnage t  
      Central part measurement method:      
      Shell diameter m  
      Internal diameter m  
     
      Chamber 1:      
      Inlet:      
      Inlet trunnion diameter mm  
      Distance to top of balls (*) mm (from top of inlet trunnion)  
      Height H inlet m  
      Outlet:      
      Central screen diameter mm (intermediate diaphragm)  
      Distance to top of balls (*) mm (from top of central screen)  
      Height H outlet m  
      Height H average m  
      Volume load chamber 1 %  
     
      Useful length chamber 1 m  
      Tonnage t  
      Chamber 2:      
      Inlet:      
      Central screen diameter mm (intermediate diaphragm)  
      Distance to top of balls (*) mm (from top of central screen)  
      Height H inlet m  
      Outlet:      
      Central screen diameter mm (outlet diaphragm)  
      Distance to top of balls (*) mm (from top of central screen)  
      Height H outlet m  
      Height H average m  
      Volume load chamber 2 %  
     
      Useful length chamber 2 m  
      Tonnage t  