The fields with the red border are required.
    www.themininggrindingoffice.com
    All rights reserved © 2012-2016 The Mining Grinding Office
      Sizing of hydrocyclones            
                   
      Date           
      Company/Plant  
                   
      Estimated production     t/h    
      Feed solids specific gravity     t/m³    
      % solids in the overflow     % by weight    
      % solids in the underflow     % by weight % by volume
      Estimated circulating load     % on t/h of solids    
      Overflow Passing target at
    % µ    
      Pressure drop target     kPa psi
      Hydrocyclone feed flow rate     m³/h l/sec
      D50c (application)     µ    
      Correction factor C1 (Feed)          
      Correction factor C2 (Pressure)          
      Correction factor C3 (Specific Gravity)          
      D50c (base)     µ    
      Theorical cyclone diameter required     cm 
                  
      Available cyclone diameter choose ----->
    cm 
                  
      Number of cyclones required            
      Capacity for 1 cyclone     m³/h l/sec
      Number          
                   
      Apex and Vortex dimension required            
      Apex diameter     cm inches
      Vortex diameter     cm inches
                   
    www.themininggrindingoffice.com
    All rights reserved © 2012-2016 The Mining Grinding Office